Tuesday, June 1, 2010

Work Progress Update

Over the holiday I managed to install the staging yard bench work and track. Built the lift bridge module and installed it (Yes I want the lift bridge more than additional commercial street trackage).

Sometimes you have information under your nose and never realize it. In order to install the bench work staging I had to clear out all the suitcases and other RR items stored in the closet. Included were several tubes with blueprints and charts from the Maine Central and a Map/Chart of all the PT trackage around Portland. WOW I had forgotten I had it. What is even more of note was that the chart lists every industrial customer that was served by the PT circa 1970! Each customer name is listed in association with the yard nearest the customer. I was explaining this little gem to my wife and how I had forgotten I had it when she made a great suggestion, have it framed and hang it in the room! I will do that and some of the other track charts would make great wall hangings if framed.

Thursday, May 20, 2010

Yard 8 tracks laid


My version of "Yard 8" is completed. Still much to do. Solder all joints, install tortoise switch machines on the main tracks, install ground throws on the yard tracks and wire all of it up.

I need to work on staging bench work the bridge and mill modules before laying any more track. With a whole weekend off I may be able to get that done and the other home projects on the honey do list.

Saturday, May 8, 2010

Work Update

Mounted the yard modules on benchwork, painted the surface and laid out track centerlines. Need to complete 2 more modules for the visble sections to be complete. Staging benchwork is next though before installing the module that runs across the front of the closet door. Last item to tackle is the bench work for harbor piers.

Saturday, May 1, 2010

Work Progress

I have been assembling the sections over the last week, only a couple of more to do. Keep vacillating about the lift bridge area and whether or not to keep it or make it more of Commercial Street. I will have to decide before I make that module as the bridge scene will require a cutout for the water section.

Friday, April 23, 2010

Commercial Street



The upper photo is midway down Commercial Street (East), the lower photo is where the street running began (West End).

Thursday, April 22, 2010

Track Plan


The tentative track plan. I will adjust the whole street running area as I layout the tracks. Any and all comments and suggestions are welcome.

Monday, April 19, 2010


The other side of the room, what is left of the benchwork where the peninsula was, soon to be 2 piers. The tracks will run along the wall and be street running modeled to have the feel of Commercial Street from when I used to roam it in the 70's. I will take specific details from that area and era and put them into the scene. More details to follow on that. Including my photos from the 1970's of Commercial Street.