The conveyor is complete and sitting in it's location, all other structures are in their final location. All need weathering, the conveyor needs all of the vertical supports scratch/kit bashed yet but the plant layout is where I like it. I have a lot of piping and details I want to complete on this complex. Several Radical Flats buildings will be used on the back drop, after I put the one I will create behind them.
What else have I been doing since the last post? Weathered a lot of cars and built a through truss bridge. The water crossing just behind the camera will be the next area I move to after completing this corner.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment