Sunday, September 26, 2010

Power is Back



I spent the day running bus wires under the bench work and then added the feeders to the Commercial Street Section.

I also built the removable section for the doorway before Vacation but never posted a picture. I will do the fianl track installation and power it next. This was my first time using the Woodland Scenics water. It took some of the paint from the base and made a very interesting murky water effect.

3 comments:

Michael Sherbak said...

Nice Work Mr Green !

Mike McNamara said...

The bridge piece is very nice looking. I need something similar to connect the B&M into Groveton across an access door to a small closet. I like how you kept it small with minimal scenery. Is it just a drop in, or swing, or fold down? I am thinking I will go with a drop in and lock kind of arrangement as I do not need to take it in and out often.

Cam said...

Mike,

It is a drop in, I used door latch slides which are under the section. The door opens and shuts with the section in place. I have for easy access w/o ducking under between operating.