
I started the installation of the first bridge on the layout. After removing the existing track by cutting the rail to length, I sawed out the section of laminated roadbed where the bridge will go. After making two abutement backs, I installed the deck bridge structure. It is a simple Atlas deck bridge section with a microengineering bridge tie section installed on top ILO the Atlas snap track that comes with it. I then made the gaurd rails from code 70 rail and supper glued them in place. I will work on blending the scenery base into the bridge abutement. I will post again when that is complete. I am waiting on some material to complete the abutments.
No comments:
Post a Comment